Our biggest challenge here was the uneven ground and getting plant machinery in. Our senior technician Stephen after careful planning went with scaffolding to reach the window, once the glass was lifted onto the platform ensure the engineers safety the glass was fitted with ease.
The area was closed off to the public throughout the installation period.