Two large 2 metre squared 6.4 and 8.8 laminated bronze DGU’s supplied and fitted for EMW in Milton Keynes site. Spider crane and Truck mount required to replace the broken units following Health and Safety guidelines.
Works were carried out at height on the building third floor, the specified units were made where designed using 8mm toughened Low e glass tinted.
This job shows our experience and expertise across the glazing sector. This latest project showcases our ability.