EMW – Milton Keynes

Two large 2 metre squared 6.4 and 8.8 laminated bronze DGU’s supplied and fitted for EMW in Milton Keynes site.   Spider crane and Truck mount required to replace the broken units following Health and Safety guidelines. Works were carried out at height on the building third floor, the specified units were made where designed using … Read more

Carphone Warehouse – Wolverhampton

Yes we did, following an attack at one of the Carphone Warehouse, we boarded every single window in one night to secure these premises for the client following the attack.  The internal shutters were damaged as well to gain access. We did re-glaze the windows in specialised laminated glass following this episode for the client … Read more

Innovation Centre – Longbridge

Our biggest challenge here was the uneven ground and getting plant machinery in.   Our senior technician Stephen after careful planning went with scaffolding to reach the window, once the glass was lifted onto the platform ensure the engineers safety the glass was fitted with ease.  The area was closed off to the public throughout the … Read more

Blythe Water Café – Solihull

This was one of our many projects which entailed a complete strip of all away existing single glazed windows and replacement and install of double-glazed uPVC windows. This particular job was challenging due to the nature of the business and popular location for the public to hold meetings.  There were certain timescales to adhere to … Read more

Apprenticeship Success

When finishing High School, I decided to stay on at 6th form to further my education, however I then realised this wasn’t the path I wanted to take and would prefer a learning on the job role and looked into apprenticeships. I advertised my CV into the market place and was contacted by a training … Read more